Long Road & Holly Street Reconstruction

  

DEI was awarded the Long Road & Holly Street Reconstruction project from the City of Greenwood Village. Long Road Reconstruction - This project includes reconstruction of 4,900 l.f. two lane wide pavement, drain pan and sidewalk, 13,500 s.y. mill and overlay. Also includes 6,030 l.f. of 12”, 610 l.f. 8”, 470 l.f. of 6” PVC waterline, as well as 1,760 l.f. of 18”, 1,730 l.f. of 24” RCP storm sewer. 1.5 acres landscaping and irrigation, 750 l.f. guardrail and 2 median islands with enhanced concrete pavement. Holly Street Intersection Rehabilitation – This project includes full depth remove and replacement of curb and gutter, walk, and concrete pavement at 2 intersections, milling of remaining 2 concrete intersections, un-bonded 5” concrete overlay, integral color and highlight stampings, removal and replacement of curb and gutter at 3rd asphalt intersection, patchwork, milling, and SMA overlay. Landscape restoration, plantings, and irrigation modifications.

College Green Pipe Replacement

  

DEI was awarded the College Green Pipe Replacement project from the City of Greeley. This project consists of removal of storm sewers, landscaping, asphalt, concrete curb & gutter, and sidewalk. Install 700 l.f. of 60” HP pipe, 3 box base storm sewer manholes with inlets, 40 l.f. of 4” – 12” PVC, roof and vault drains. Restore asphalt roadways and concrete flatwork, tackified finished ground for landscape restoration, construct and maintain erosion and sediment control on local streets.